A Project Online alternative for post-retirement PMO forecasting
Project Online is gone and Planner does not carry the governance side. Pocket PMO is a browser forecasting layer: import your schedules, run PERT, Monte Carlo and EVM, and roll the portfolio up in one place.
| Decision area | Typical alternative | Pocket PMO |
|---|---|---|
| Availability | Retired on 30 September 2026; projects and data are no longer accessible through the service | Live in the browser today, free in beta |
| Positioning | The designated successor Planner covers task execution, not PMO governance | A forecasting and governance layer above whatever your teams use |
| Schedule import | Plans must be rebuilt or migrated into a new estate | Import a Microsoft Project .xml or Primavera P6 .xer export |
| Forecasting | Dates re-derived by hand in spreadsheets | PERT three-point estimates, CPM critical path, Monte Carlo with iteration counts up to 10,000, P50/P80 dates |
| Cost control | Budgets and EVM rebuilt in spreadsheets | Budgets with EVM (CPI, SPI, EAC, VAC) on the same project record |
| Portfolio oversight | Per-plan views; roll-ups assembled by hand | Portfolio budgets, risk counts, and RAG status in one dashboard |
Project Online retired. The search is for what replaces it.
Microsoft retired Project Online on 30 September 2026. The subscription estate that hosted portfolios, resourcing, and reporting no longer exists, and PMOs that depended on it are choosing replacements right now under time pressure. That pressure is worth resisting in one specific way: the replacement decision is really two decisions. One is where task execution lives, and Microsoft has an answer for that in the newer Planner. The other is where forecasting, budgets, earned value, and portfolio oversight live, and that answer is open. This page is about the second decision.
What the designated successor does not carry
Planner is a reasonable home for plans, tasks, and assignments, and for teams whose reporting is task-by-task it may be enough. It has no budgets or cost tracking, it carries a single baseline where Project Online carried eleven, and its portfolio oversight is thinner than what Project Online provided. Governance has to come from somewhere: spreadsheets, a Microsoft-stack portfolio tool, or a forecasting layer above the execution tool. Saying that plainly is more useful than pretending the retirement was a like-for-like upgrade.
What a Project Online replacement actually has to do
List what the old service actually did for you before shopping. For most PMOs it was four things: it held the schedule of record, it produced dates people could defend, it tracked cost against plan, and it rolled projects up into one portfolio view. A replacement that only does the first of those leaves you doing the other three by hand, which is exactly the copy-paste burden Project Online removed in the first place. Score candidates against the four, not against a feature list.
Bring the schedules you already have
Whatever you saved before retirement, and whatever still lives in scheduling tools, can seed the new estate. Pocket PMO imports a Microsoft Project .xml export or a Primavera P6 .xer export directly, and relationship details come across with it: finish-to-start, start-to-start, finish-to-finish, and start-to-finish links and their lag are all retained. The forecast network itself uses finish-to-start relationships only and does not apply link lag, so CPM and Monte Carlo results can differ from the source schedule where it relies on other link types or lag. There is no migration programme around it and no connector to configure: the file you exported is the migration. Teams that left retirement with a folder of exports can start from those files the same afternoon.
Forecasting that produces defendable dates
Pocket PMO computes PERT expected durations from three-point estimates, the critical path and float from CPM, and Monte Carlo delivery probabilities with iteration counts selectable up to 10,000. The output is the kind of number Project Online never produced: a P50 date for planning, a P80 date you can defend to a steering group, and the chance of hitting a promised date. Per project those numbers take minutes, and that speed matters after a retirement, because the honest alternative for most PMOs is a spreadsheet model nobody fully trusts.
Budgets and earned value on the same record
Project Online carried budgets and earned value reporting; the successor does not, and the usual workaround is a parallel spreadsheet that drifts from the plan. In Pocket PMO the budget and progress live on the project record itself, and the app computes the standard earned value metrics from them: CPI, SPI, the estimate at completion, and variance at completion. When the budget changes, the EVM position follows, because there is one copy of the data rather than two.
A layer, not a rip-and-replace
A Project Online alternative does not have to be a platform migration. Pocket PMO sits above execution: teams keep working in Planner, Jira, Asana, Smartsheet, or files, and the forecasting layer holds the numbers. Nothing about licensing, identity, or how work is assigned changes. That is what makes trying it cheap: one project, one afternoon, no tenant work. If it earns its keep, expand project by project; if it does not, nothing has to be unwound.
Where a full PPM suite is the right answer
Honesty requires the counter-case. If you need deep resource management across hundreds of projects, procurement-mandated vendor relationships, or programme-level dependency management inside the Microsoft estate, an enterprise portfolio tool is the right shape of purchase, and Pocket PMO is not trying to be that tool. It is a forecasting layer for PMOs who need credible numbers weekly, not an implementation programme. Score your actual requirements, not fear of missing features.
Try it on one real retired project this week
Pick the project whose reporting you miss most. Import its schedule from a Microsoft Project .xml or Primavera P6 .xer export, or enter the tasks as three-point estimates, which takes minutes. Enter the budget, run the Monte Carlo simulation, and put the P80 date next to the date you had been promising. Generate the weekly status file and read it as a steering member would. Pocket PMO is free in beta and runs in the browser, so the whole trial costs an afternoon and nothing else.
Frequently asked questions
Is Project Online still available?
No. Microsoft retired Project Online on 30 September 2026, and its projects and data are no longer accessible through the service. Microsoft's documented export routes applied while the service was live, so a previously saved export still holds your records, but nothing can be pulled from the retired service now. For anything beyond that, Microsoft's official retirement guidance and your Microsoft account team are the authoritative sources.
Does Pocket PMO replace Planner?
No, and it is not designed to. Planner is where task execution happens after the retirement; Pocket PMO is the forecasting and governance layer above it. Budgets, three-point estimates, Monte Carlo simulation, earned value, and portfolio roll-ups live in Pocket PMO; plans, tasks, and assignments stay where they are. The two do not conflict, because only one of them holds the numbers.
Can I import my old Project Online data?
Directly, no: there is no Project Online connector, and the retired service cannot produce new exports. Indirectly, yes, if your saved data includes schedules you can open in a scheduling tool: save them as Microsoft Project XML and import the .xml file, or export from Primavera P6 as .xer. Records that only exist as generic exports, such as task lists in a spreadsheet, can be re-entered as three-point estimates, which is faster than it sounds for a pilot on one project.
Do I need Project Online or a Microsoft subscription to use Pocket PMO?
No. Pocket PMO is a standalone browser application with a free beta tier. Calculations run in the browser, and nothing connects to a Microsoft tenant. Teams on Microsoft stacks use it beside Planner; teams on Jira, Asana, Smartsheet, or files use it the same way.
Does Pocket PMO store schedule baselines like Project Online did?
No. Pocket PMO is a forecasting layer, not a baseline archive, and we would rather say so than stretch the fit. Keep baselining in your scheduling tool and use Pocket PMO for what Project Online never did well: probability-based forecasting, earned value, and portfolio roll-ups.
What does Pocket PMO cost?
Nothing while Pocket PMO is in beta. Paid tiers are planned and will be announced before they ship, adding cross-device forecasts, weekly file history, and cloud backup. There is nothing to install and no server to run in the meantime, because calculations run in the browser.
Related planning pages
When Pocket PMO is a good fit
Choose Pocket PMO when you want a forecasting and control layer that connects WBS planning, estimation, schedule risk, earned value, stakeholders, budget tracking, and reporting.