Free project management calculators

Four calculators for schedule and cost estimates: PERT three-point estimates, critical path, Monte Carlo simulation, and earned value management. Each runs in your browser and none needs an account.

Estimates you can defend, without buying anything

Every calculator on this page runs the same computation engines Pocket PMO uses inside the app, and each one runs entirely in your browser. Nothing you type is uploaded, stored, or attached to an account, because there is no account. You enter numbers, you get results, you close the tab.

The four cover the core of quantitative estimating: PERT turns three-point estimates into expected durations and a standard deviation, the critical path calculator runs the forward and backward pass that finds which activities have no slack, the Monte Carlo calculator simulates thousands of possible runs of your network, and the EVM calculator computes planned value, earned value, and the cost and schedule indices from your milestones.

Which calculator answers your question

Wondering how long one activity will really take, or what the chance of finishing a chain of activities by a date is? Use the PERT calculator. Wondering why the project cannot finish earlier, or how much an activity can slip without moving the end date? Use the critical path calculator. Wondering what date you can actually promise, with the uncertainty of every activity in the mix? Use the Monte Carlo calculator. Wondering whether the project is over or under budget and schedule right now? Use the EVM calculator.

From calculator to project

A calculator answers one question once. The same techniques applied to a living project answer it every week: estimates stay attached to the schedule, the forecast moves when work moves, and the numbers stop living in a spreadsheet someone forgot to update. That is what Pocket PMO adds, and the free tier lets you run a real project through it before deciding whether you need it.

The calculators

Frequently asked questions

Are these calculators really free?

Yes. All four calculators run in your browser with no sign-up, no trial, and no limits. They use the same computation engines as the Pocket PMO app, where the free tier also covers the full workflow.

Do you store the numbers I enter?

No. The calculators are pure client-side components: your inputs go into a calculation function in your browser and the results are displayed. Nothing is sent to a server, saved to storage, or linked to you.

How accurate are the results?

The arithmetic is exact: PERT, critical path, and EVM compute standard formulas from your inputs. The Monte Carlo results are simulated, so percentile values move slightly between runs; with 10,000 iterations they are stable to about a tenth of a day. The real accuracy limit is your input ranges, not the math.

What is the difference between PERT and Monte Carlo?

PERT collapses each three-point estimate into one expected duration and a variance, then uses a normal approximation. Monte Carlo samples the full triangular range of every activity thousands of times and schedules the network on each run, so the result reflects how ranges combine through dependencies rather than a single averaged path. For a first pass, PERT; for a number you plan to defend, Monte Carlo.

Can I use these on a real project without signing up?

Yes, as often as you like. When you want the estimates connected to a living schedule, imported from Primavera P6 or Microsoft Project, and reforecast when work changes, that is what the Pocket PMO app does; its free tier requires an account, the calculators do not.