EVM calculator

Compute earned value metrics from your budget, plan dates, and milestone progress: planned value, earned value, CPI, SPI, variances, the estimate at completion, and earned schedule.

EVM calculator

Enter the budget, the planned start and finish dates, and one row per milestone: its share of the budget, its milestone cost, and its progress. Milestones that are in progress earn 50% of their weight, the same rule the app uses, and the displayed actual cost applies that same progress weighting: complete milestones count their full cost, in-progress milestones count half, and not-started milestones count nothing.

MilestoneBudget weight %Milestone costProgress

What this EVM calculator does

The calculator computes the earned value management baseline from your inputs. Planned value is the budget times the planned percent complete, taken as the elapsed share of the plan at the status date. Earned value is the budget times the progress actually achieved, credited per milestone: a complete milestone earns its full weight, a milestone in progress earns half its weight, and a not-started milestone earns nothing. Actual cost applies the same progress weighting to the milestone costs: a complete milestone contributes its full cost, an in-progress milestone half, and a not-started milestone nothing.

From those three values it derives the standard metrics: cost variance (EV minus AC), schedule variance (EV minus PV), the cost performance index (CPI = EV / AC), the schedule performance index (SPI = EV / PV), the estimate at completion (AC plus the remaining budget adjusted by CPI), the variance at completion, and the earned schedule family: earned schedule percent, SPI(t), the time estimate at completion, and the projected finish date.

A worked example

A project with a 100,000 budget runs from 2026-01-05 to 2026-04-15, so the plan spans 100 days. Status date 2026-02-19: 45 days in, so the plan says 45 percent should be done. Three milestones: kickoff, 10 percent of budget, complete, 10,000 of cost. Design, 30 percent, in progress, 25,000 of cost. Build, 60 percent, not started, no cost entered. The calculator returns:

  • Planned value 45,000; earned value 25,000; actual cost 22,500, the progress-weighted cost of the 35,000 entered
  • CPI 1.11: each dollar of weighted cost counted so far is delivering 1.11 dollars of earned value
  • SPI 0.56: the project has earned 56 percent of the value the plan expected by now
  • Cost variance +2,500; schedule variance -20,000
  • Estimate at completion 90,000; variance at completion +10,000
  • Earned schedule 25 percent, SPI(t) 0.56, projected finish about 2026-07-04

Reading a project that is cheap but late

The example above is the classic pattern the two indices exist to separate. CPI above 1 says money is being spent efficiently: what has been done cost less than planned. SPI of 0.56 says far too little has been done compared with the calendar. The cost efficiency is real but it cannot recover the schedule by itself, which the earned schedule numbers make explicit: at 25 percent earned against a 45 percent clock, and 180 total days at the current rate against a 100-day plan, the projected finish lands in July, not April. A report that showed only cost variance would call this project a success.

How progress credit works, and why 50 percent

The calculator credits in-progress milestones at half their weight, the same convention the Pocket PMO EVM tracker uses. Milestone methods always need a rule for partial credit, and half credit is a defensible default: it neither flatters work that has barely started nor punishes work that is nearly done. If you need finer credit, split the milestone into smaller ones and mark each complete or not started; the weights should sum to 100 percent of budget across all milestones.

What the estimate at completion is really assuming

EAC = AC + (BAC - EV) / CPI assumes the cost efficiency observed so far continues for the rest of the project. That is the standard CPI-based forecast and usually the most honest single number, but it is a projection, not a promise: if the overspend so far was a one-off purchase, the true cost will come in under it, and if the efficiency came from the easy work being done first, it will be exceeded. Watch the trend of CPI across status dates, not the single reading.

Why earned schedule exists alongside SPI

Classic SPI in money terms becomes hard to read late in a project: as the project nears its end, earned value approaches the budget and SPI drifts toward 1 no matter how late the work is. Earned schedule fixes this by measuring progress in time: it converts earned value into the date the plan said that much work would be done by, and SPI(t) compares that against the status date. SPI(t) stays meaningful to the end, and the time estimate at completion translates it into a projected finish date you can put next to the promised one.

From a status-day calculation to a tracker that stays current

Inside Pocket PMO the same engine runs continuously: milestones carry their weights and costs, the status date is today by default, and the metrics sit next to budget tracking and the forecast so cost and schedule health are read from the same source. The calculator here is that screen with the project plumbing removed.

How to use this calculator

  1. Step 1

    Enter the project budget and the planned start and finish dates.

  2. Step 2

    Enter one row per milestone: its share of the budget, its milestone cost, and its progress.

  3. Step 3

    Set the status date, or leave it empty to use today.

  4. Step 4

    Calculate to read the earned value metrics, indices, and estimate at completion.

Why the extra numbers matter

A single-point estimate hides its own uncertainty. These tools put the range on the table before the schedule is committed, which is exactly where it is cheapest to find out that a plan is optimistic.

  • Know whether the project is over or under cost and schedule right now, from three numbers per milestone
  • Get CPI and SPI, the two indices status reports are built on
  • See the estimate at completion while there is still time to act on it
  • Same engine as the EVM tracker inside Pocket PMO

Frequently asked questions

How is planned value calculated here?

PV is the budget times the planned percent complete, and planned percent complete is the elapsed share of the plan at the status date: days from planned start to status date, divided by total planned duration, clamped to 0 to 100 percent. Once the planned finish date has passed, PV equals the full budget.

How much earned value does an in-progress milestone get?

Half of its budget weight. Complete milestones earn their full weight, not-started milestones earn nothing. To record finer progress, split the milestone into smaller ones whose weights together represent the work.

What does a CPI below 1 mean?

That the work performed is worth less than the progress-weighted cost counted to perform it: a CPI of 0.85 means each dollar of weighted cost has delivered 85 cents of earned value. Sustained CPI below 1 is the standard trigger for a cost review, and the estimate at completion assumes the observed efficiency continues.

Why does the calculator also show earned schedule metrics?

Because SPI in money terms loses meaning late in a project: earned value approaches the budget as work completes, so SPI drifts toward 1 even when the project is months late. Earned schedule measures progress in time instead, so SPI(t) and the projected finish date stay meaningful to the end.

What should the milestone budget weights add up to?

100 percent of the project budget. Each milestone’s weight is its share of the budget, and earned value credits those weights by progress. The calculator asks you to fix the weights if they exceed 100 percent or are all zero.

What if I leave the status date empty?

The calculator uses today. Set an explicit status date to reproduce a historical reading, or to evaluate a plan against a fixed point in time, for example the worked example on this page.

Keep going in Pocket PMO

In Pocket PMO the EVM tracker keeps the milestone baseline, costs, and status date in one place and reads them next to the forecast and budget. The free tier covers it end to end.