Explain your forecast to the right people
Share the full P80 curve or a two-line summary, depending on what your sponsor needs. Identify who matters, what they need, and how the team should communicate throughout the project lifecycle.
What stakeholder management software is actually for
Stakeholder management is the discipline of knowing who can help or hurt your project, what each of them needs from you, and how often you should be talking. On most projects this lives in someone's head. The head changes jobs, the list evaporates, and the next project manager starts from zero with a steering pack and no context. Stakeholder management software exists to move that knowledge into the project record, where it survives personnel changes and gets re-checked instead of remembered.
The spreadsheet version fails for the reason every project spreadsheet fails: nothing that happens during delivery ever flows back into it. A sponsor loses interest, a resistant department head is replaced, a reorg moves budget authority, and the sheet still shows what it showed at kickoff. A dedicated tool earns its keep when re-scoring is cheap enough to actually happen, and the engagement plan attached to each name changes the moment their position does.
If you run two or more projects, the bottleneck is not listing stakeholders. It is remembering, mid-week, which sponsor wants detailed forecasts and which wants a two-line summary, and who you promised a call after the last slip. That is working memory, and it does not scale across projects. A stakeholder planner is externalized working memory: it records what each person cares about, how they currently feel, and what the project owes them, so your attention goes to the conversation instead of the recall.
The stakeholder engagement plan is the deliverable
A stakeholder engagement plan states, for each stakeholder, how often you communicate, through which channels, at what level of detail, and who gets consulted versus informed. Most plans are written once, pasted into the project charter, and never opened again. They go stale because they are disconnected from the thing they plan for: the current position of each stakeholder on the influence-interest map.
Pocket PMO attaches the plan to the map. Each quadrant of the grid carries a full engagement plan, shown beside the stakeholders sitting in it: frequency, methods, reporting depth, expected engagement level, and documentation.
- Manage Closely (high influence, high interest): weekly face-to-face meetings, direct calls, and executive briefings, with detailed progress reports covering metrics and forecasts, and active participation in decisions.
- Keep Satisfied (high influence, low interest): bi-weekly email updates and scheduled check-ins, high-level reporting focused on key milestones, consultation reserved for critical changes.
- Keep Informed (low influence, high interest): weekly updates, newsletters, and dashboard access, with regular progress detail and room for feedback.
- Monitor (low influence, low interest): monthly automated reports and milestone notifications, minimal involvement by design.

The plan follows the person, not the document
Because the plan hangs off the quadrant, a re-scored stakeholder inherits the right plan automatically. Drag a director from Keep Satisfied to Manage Closely and the frequency, methods, reporting depth, and documentation expectations change with them; you never edit two documents to say one thing. The plan is computed from the current position (the computed, not compiled, idea applied to engagement), so it cannot drift out of date the way a pasted charter section does.
This changes the maintenance question. The old question was "when do we revise the engagement plan?" and the honest answer was never. The new question is "when do we re-score people?", which has real triggers: a milestone, a governance change, a sponsor going quiet. Keep the scores current and the plan maintains itself.
Stakeholder mapping that moves
Stakeholder mapping plots every stakeholder on a power-interest grid, influence on one axis and interest on the other. The four quadrants earn their names honestly, and each carries a default posture:
- Manage Closely: high influence, high interest. Engage actively and protect the relationship; these people can end the project and want to hear about it weekly.
- Keep Satisfied: high influence, low interest. They can hurt you but do not want daily involvement; concise milestone-level reporting keeps them benign.
- Keep Informed: low influence, high interest. They care deeply and talk to people; informed champions help, surprised ones undermine.
- Monitor: low on both axes. Minimal effort, reviewed occasionally in case their position moves.

Position and attitude, kept current
In Pocket PMO the map is interactive. Drag a stakeholder card from one quadrant to another and their influence and interest scores update in the record, the quadrant counts recalculate, and the engagement plan changes in the same motion. Placement takes seconds, which matters because maps go stale when updating them is a half-hour spreadsheet session nobody schedules.
One placement rule worth knowing: a medium score is treated as high when the quadrant is decided. Medium influence with low interest sits in Keep Satisfied, and medium on both axes lands in Manage Closely. Borderline people surface in the active quadrants where you will actually see them instead of hiding in Monitor.
Each stakeholder also carries an attitude: supportive, neutral, or resistant. Position tells you how much attention someone deserves; attitude tells you what kind. A resistant stakeholder in Manage Closely needs different conversations than a supportive one in the same cell, and the map is where you notice that before the steering meeting, not during it.
The record behind the dot
A dot on a grid is not enough to act on, so each stakeholder in Pocket PMO carries a full profile: name, organization, title, department, email, phone, influence, interest, attitude, and free-form tags for whatever taxonomy your project uses. Email is the preferred identity key: the app blocks duplicate addresses and reuses an existing record when the same person is added to another project, so the finance controller you mapped on Project A is the same record when they appear on Project B. Entries saved without an email follow a separate migration path: they receive a placeholder address built from the normalized name, and name matching acts as the fallback, so two name-only entries with the same name still land on one record. Tags accept comma-separated values, so vendor, steering committee, and end-user labels stay attached to the person rather than to one project's notes.
From map to mandate: the RASCI matrix
Mapping tells you who matters. The RASCI matrix tells you who does what. In Pocket PMO's Roles tab, stakeholders form the rows and your Level 1 WBS tasks form the columns, read straight from the work breakdown structure. Each intersection takes one of five roles:
- R (Responsible): does the work on the task.
- A (Accountable): owns the outcome. A second A on the same task draws a warning.
- C (Consulted): provides input before decisions.
- S (Supported): helps get the work done and clears obstacles.
- I (Informed): told what happened.
A health check for role ambiguity
Two mechanics make the RASCI grid more than a picture. First, each task column carries an assignee selector that writes back to the WBS, so naming an owner here updates the same structure the CPM, PERT, and Monte Carlo screens read. One work breakdown structure, with role clarity living inside it. Second, the grid validates as you build it: tasks with no Accountable, no Responsible, or multiple Accountables get flagged, and the offending columns turn amber so the gaps are visible without running a report.
The health summary beneath the grid counts the tasks that have an Accountable, the tasks that have a Responsible, and lists the failures by name, so the steering question "is every deliverable owned?" gets a number instead of a feeling. A role distribution card totals assignments per role, and the per-stakeholder count shows who is quietly carrying ten roles while three colleagues carry none. A search field filters the grid when the lists outgrow one screen.

One project record, not another isolated file
Stakeholder plans go stale for the same reason risk registers do: disconnection. Pocket PMO keeps stakeholders in the same project record as the work breakdown, the risk matrix, budget tracking, and status reporting, and the RASCI grid reads its tasks from the one WBS the scheduling tools use. Stakeholder data is not a side file either: it lives in a central store that survives project changes, which is what makes the same person the same record everywhere they appear.
Three stakeholders worth mapping on every project
Not sure what belongs on the map at kickoff? These three show up on almost every project, and each lands in a different quadrant, which is exactly the point of mapping them.
- The funding gatekeeper: high influence, low interest, often neutral. They approve or block money but think about your project quarterly. Keep Satisfied: bi-weekly executive summaries, milestone focus, consultation only when the change touches their budget. The day they turn resistant, update their attitude and increase engagement as needed; move them into Manage Closely only if their influence or interest changes.
- The hallway champion: low influence, high interest, usually supportive. End users and team leads who care more than their org chart position suggests. Keep Informed: weekly updates and dashboard access. Champions recruit allies; neglected champions recruit skeptics.
- The unowned deliverable: not a person, but the RASCI health check's most common finding. Run the grid against your Level 1 tasks and look for the amber column: a workstream everyone assumed someone else was Accountable for. Finding it in week two is planning; finding it in week nine is an incident review.
How often should you re-map stakeholders?
Re-score at milestones, after governance changes, and whenever a stakeholder's behavior contradicts their record: the sponsor who has skipped three updates is telling you their interest dropped, and the map should say so before the escalation does. In Pocket PMO a re-score is a drag and a click, so the honest cadence is whenever reality moves. Quadrant counts and engagement plans update in the same motion, so a stale map becomes a choice instead of an accumulation of postponed spreadsheet sessions.
A connected workflow, not another isolated file
Pocket PMO keeps project management techniques close to the rest of the project record so decisions can be based on consistent data.
- Map power, interest, and engagement needs
- Clarify responsibilities with structured stakeholder data
- Keep communication planning connected to delivery status
- Re-score stakeholders as influence and sentiment shift during delivery
How teams use it
- Step 1
List internal and external stakeholders.
- Step 2
Assess influence, interest, sentiment, and engagement needs.
- Step 3
Use the plan to guide communications and escalation.
- Step 4
Revisit the matrix at milestones and after governance changes so engagement stays aligned with delivery reality.
Frequently asked questions
Is Pocket PMO a CRM for stakeholders?
It looks like one at first: names, organizations, titles, emails, phone numbers. The purpose is different. A CRM tracks a sales pipeline; Pocket PMO tracks engagement around project work: where each person sits on the power-interest grid, how they feel about the project (supportive, neutral, resistant), what communication cadence their quadrant calls for, and which WBS deliverables they hold RASCI roles on. Contact details exist so the plan is actionable.
How is RASCI different from RACI?
The S. RACI gives you Responsible, Accountable, Consulted, Informed. RASCI adds Supported: the people or groups who help the Responsible party get it done, such as a PMO analyst, a test environment team, or a legal reviewer who decides nothing but whose delay blocks delivery. On projects that share services, the S column is where work quietly stalls unassigned, so Pocket PMO uses RASCI and counts every role in the distribution summary.
Does Pocket PMO email my stakeholders for me?
No. The tool holds the record, the map, and the engagement plan that says who gets what, how often, through which channel. Sending happens in your own channels. That boundary is deliberate: the weekly Manage Closely meeting still needs you in the chair, and the tool's job is to make sure you walk in knowing each person's current position, attitude, and plan.
What happens to a stakeholder list from an older project?
It migrates. Stakeholders stored on the project from earlier versions are moved into the central stakeholder store with their project associations intact. Plain name-only entries become full records with influence and interest defaulted to medium and a neutral attitude, ready for you to re-score. Email is the preferred match key: records with an address are matched by normalized email first. Entries saved without an email get a placeholder address built from the normalized name, and name matching serves as the fallback, so two name-only entries with the same name still converge on a single record. Migration is also conservative with your original data: if any entry fails, the legacy project lists stay in place as a recovery copy, and they are only removed after a fully clean migration.
Can one person be Accountable and Responsible for the same task?
Each cell in the grid holds a single role, so one stakeholder holds one role per task. What the app does police is coverage: a task with no Accountable is flagged, a second Accountable draws a warning (it lets you proceed, because real orgs are messy), and a missing Responsible turns the column amber. The health summary lists every offending task by name.
How many stakeholders should a project map have?
Enough that nobody with real influence over the outcome is surprised by the project, and few enough that each entry gets an honest score. For most projects that is eight to fifteen names. Watch for the two failure modes: the vanity map with forty entries where nobody below the top five was ever re-scored, and the minimalist map that omits the resistant department head who kills the rollout in week nine. If every stakeholder lands in Manage Closely, the map needs re-scoring, not presenting.
Related planning pages
Stakeholder analysis for sharing your forecast
Map power, interest and cadence so you know who gets the full forecast curve and who gets a two-line P80 summary.
Work breakdown structure that feeds the forecast
Break scope into work packages with three-point estimates, so the Monte Carlo forecast and P80 finish date are built from the work itself. Free while in beta.
ROM estimates that feed the Monte Carlo forecast
Build a rough order of magnitude (ROM) range early, then refine into three-point estimates that feed the critical path and P80 finish date. Free while in beta.
PERT analysis software for schedule estimates
Estimate project schedules with optimistic, most likely, and pessimistic durations using PERT analysis in Pocket PMO.
See it in Pocket PMO
Pocket PMO keeps project management techniques close to the rest of the project record so decisions can be based on consistent data.